Amanote Research

Amanote Research

    RegisterSign In

The Design and Construction of the Muon Arm in PHENIX. Final Report

doi 10.2172/764575
Full Text
Open PDF
Abstract

Available in full text

Date

September 28, 1999

Authors

Unknown

Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Electrical and Mechanical Design Report of the Muon Toroids for the Beamline to the Muon Laboratory

1987English

Large, Light, High-Acceptance CSC Chambers for the PHENIX Muon Detector Using a Honeycomb Panel Design

English

Design, Construction and Test of Small-Diameter Muon Drift Tube Chambers (sMDT) for the Phase-1 Upgrade of the ATLAS Muon Spectrometer

Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
High Energy PhysicsInstrumentationNuclear
2020English

Design and Construction of Large Size Micromegas Chambers for the ATLAS Upgrade of the Muon Spectrometer

2015English

Photogrammetric Measurement of Final Pay Quantities in Highway Construction : Final Report

1960English

Design and Construction of a Variable Stiffness Prosthetic Arm Prototype

English

Development of a SWIR Solar Spectral Radiometer for the ARM Program. Final Report

1995English

Final Report on the CERN Muon Storage Ring Including the Anomalous Magnetic Moment and the Electric Dipole Moment of the Muon, and a Direct Test of Relativistic Time Dilation

Nuclear Physics B
High Energy PhysicsNuclear
1979English

Design of Reinforced Embankments : Final Report

1986English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy