Amanote Research

Amanote Research

    RegisterSign In

Scheduling in a Three-Machine Flexible Robotic Cell

IFAC Proceedings Volumes
doi 10.3182/20060517-3-fr-2903.00061
Full Text
Open PDF
Abstract

Available in full text

Date

January 1, 2006

Authors
Hakan GultekinM. Selim AkturkOya Ekin Karasan
Publisher

Elsevier BV


Related search

A Genetic Algorithm Approach for the Scheduling in a Robotic-Centric Flexible Manufacturing System

2017English

Development of a Fuzzy-Simulation Model of Scheduling Robotic Flexible Assembly Cells

Journal of Computer Science
Computer NetworksSoftwareArtificial IntelligenceCommunications
2013English

Three-Machine Scheduling Problem With Precedence Constraints

Journal of the Operations Research Society of Japan
Management ScienceDecision SciencesOperations Research
1977English

Programming a Robotic Machine

Theoretical & Applied Science
2013English

Robotic Flexible Endoscope

English

Scheduling and Flexible Manufacturing

Operations Research Proceedings
1994English

Multi-Objective Optimal Model for Task Scheduling and Allocation in a Two Machines Robotic Cell Considering Breakdowns

WSEAS TRANSACTIONS ON INFORMATION SCIENCE AND APPLICATIONS
2020English

Overlap Algorithms in Flexible Job-Shop Scheduling

International Journal of Interactive Multimedia and Artificial Intelligence
2014English

A Flexible Software Framework for Transportation Maintenance Scheduling

Journal of Software
2012English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy