Amanote Research

Amanote Research

    RegisterSign In

Status Report No. 1 on Clinch River Study

doi 10.2172/4834647
Full Text
Open PDF
Abstract

Available in full text

Date

August 1, 1961

Authors
R.J. ed. Morton
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Quality Assurance/Quality Control Summary Report for Phase 1 of the Clinch River Remedial Investigation. Environmental Restoration Program

1994English

Grays River Watershed Restoration Status Report 2007, May 1, 2007 - October 30, 2008.

2008English

Nuclear Design of the Clinch River Breeder Reactor System

1975English

Technical Background Information for the Environmental and Safety Report, Volume 5: The 1977 Clinch River Sediment Survey - Data Presentation

1982English

Quality Assurance/Quality Control Summary Report on Phase 2 of the Clinch River Remedial Investigation at the Oak Ridge Reservation, Oak Ridge, Tennessee

1996English

Anodonta Imbecillis QA Test 4, Clinch River - Environmental Restoration Program (CR-ERP)

1997English

Breeding Ratio and Doubling Time Characteristics of the Clinch River Breeder Reactor

1975English

Studies of Unprotected Loss-Of-Flow Accidents for the Clinch River Breeder Reactor

1976English

George Clinch

Antiquaries Journal
Visual ArtsPerforming ArtsArcheologyHistory
1921English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy