Amanote Research
Register
Sign In
Application of a Mathematic Programming Model for Integrated Planning and Scheduling of Petroleum Supply Networks
doi 10.1021/ie070723s.s002
Full Text
Open PDF
Abstract
Available in
full text
Date
Unknown
Authors
Unknown
Publisher
American Chemical Society (ACS)
Related search
An Unit Cost Adjusting Heuristic Algorithm for the Integrated Planning and Scheduling of a Two-Stage Supply Chain
Journal of Industrial Engineering and Management
Industrial
Management
Manufacturing Engineering
Strategy
Integrated Process Planning and Scheduling and Multimode Resource Constrained Project Scheduling: Ship Block Assembly Application
A Programming Model for Student Enrolment Planning
The Journal of the Australian Mathematical Society. Series B. Applied Mathematics
Trilateral Planning Model for Integrated Community Energy Systems and PV-based Prosumers-A Bilevel Stochastic Programming Approach
IEEE Transactions on Power Systems
Electronic Engineering
Power Technology
Electrical
Energy Engineering
A Simulated Annealing-Based Optimization Approach for Integrated Process Planning and Scheduling
International Journal of Computer Integrated Manufacturing
Electronic Engineering
Industrial
Mechanical Engineering
Manufacturing Engineering
Computer Science Applications
Electrical
Aerospace Engineering
Collaborative Demand and Supply Planning Networks
Enterprise Information Systems Design, Implementation and Management
An Application of Linear Programming for Short-Term Harvest Scheduling
Northern Journal of Applied Forestry
Regional Energy Supply Planning: Chance Constraint Programming
International Journal of Energy Economics and Policy
Energy
Economics
Econometrics
Finance
Application of Linear Programming in Optimizing Labour Scheduling
Journal of Mathematical Finance