Amanote Research

Amanote Research

  • Register
  • Sign In

Packet Delay Analysis of IEEE 802.11 MAC Protocol

Electronics Letters- United Kingdom

doi 10.1049/el:20030868

Full Text

Abstract

Available in

Categories

Electronic EngineeringElectrical

Date

January 1, 2003

Authors

P. ChatzimisiosA.C. BoucouvalasV. Vitsas

Publisher

Institution of Engineering and Technology (IET)


Related search

Optimization of IEEE 802.11 MAC Protocol

International Journal of Science and Research (IJSR)
2020English

IEEE 802.11 Packet Delay - A Finite Retry Limit Analysis

English

Analytical Analysis of IEEE 802.11 MAC

International Journal of Science and Research (IJSR)
2020English

Estimation of Packet Loss on MAC Layer in IEEE 802.11 Wireless Local Area Networks

International Journal of Future Generation Communication and Networking
Computer NetworksCommunications
2015English

Hybrid MAC Protocol for IEEE 802.11 Wireless LANs With Hidden Node Problem

Journal of Electrical Engineering
2018English

Enhancing IEEE 802.11 MAC in Congested Environments

Computer Communications
Computer NetworksCommunications
2005English

Self-Organizing TDMA MAC Protocol for Effective Capacity Improvement in IEEE 802.11 WLANs

2015English

Investigation of the IEEE 802.11 Medium Access Control (MAC) Sublayer Functions

English

A Thorough Analysis of the Performance of Delay Distribution Models for IEEE 802.11 DCF

Ad Hoc Networks
HardwareComputer NetworksSoftwareArchitectureCommunications
2015English

Amanote Research

Note-taking for researchers

Follow Amanote


© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy