Amanote Research
Register
Sign In
Demonstrate Ames Laboratory Capability in Probabilistic Risk Assessment (PRA)
doi 10.2172/10116789
Full Text
Open PDF
Abstract
Available in
full text
Date
July 1, 1993
Authors
D. Bluhm
L. Greimann
F. Fanous
R. Challa
S. Gupta
Publisher
Office of Scientific and Technical Information (OSTI)
Related search
Development of a New High Power Cavity for the 590 MeV Ring Cyclotron at PSI
A New Cavity Ring-Down Topology for Remote Sensing
Magnetic Field Calculation for a 13 MeV PET Cyclotron
High Frequency Axion Search Cavity Using Dielectric Ring at IBS/CAPP
Simulation, Design, and Testing of a High Power Collimator for the RDS-112 Cyclotron
Applied Radiation and Isotopes
Radiation
Riken Ring Cyclotron Project.
Journal of the Atomic Energy Society of Japan / Atomic Energy Society of Japan
Polarization Control of High-Power Millimeter Wave for Electron Cyclotron Heating
Journal of Plasma and Fusion Research
Beam Optics for a 12-GeV Isochronous Ring Cyclotron
IEEE Transactions on Nuclear Science
Electronic Engineering
Nuclear
Nuclear Energy
High Energy Physics
Engineering
Electrical
Neutron-Deuteron Analyzing Power Data at 19.0 MeV
Physical Review C
Cavity Ring-Down Spectroscopy Sensor Development for High-Time-Resolution Measurements of Gaseous Elemental Mercury in Ambient Air
Atmospheric Measurement Techniques
Atmospheric Science