Amanote Research

Amanote Research

    RegisterSign In

Fast Scheduling of Multi-Robot Teams With Temporospatial Constraints

doi 10.15607/rss.2013.ix.049
Full Text
Open PDF
Abstract

Available in full text

Date

June 23, 2013

Authors
Matthew GombolayRonald WilcoxJulie Shah
Publisher

Robotics: Science and Systems Foundation


Related search

Multi-Robot Task Scheduling

2013English

Integrated Resource Management and Scheduling With Multi-Resource Constraints

English

Scalable Task Assignment for Heterogeneous Multi-Robot Teams

International Journal of Advanced Robotic Systems
2013English

Scheduling Operator Attention for Multi-Robot Control

2012English

Multi-Robot Area Patrol Under Frequency Constraints

Annals of Mathematics and Artificial Intelligence
Applied MathematicsArtificial Intelligence
2009English

Scheduling Multi-Skilled Manpower With Considering Teams Replacement and Site-Dependent Vehicles Routing

International Journal of Mathematics in Operational Research
ModelingDecision SciencesSimulation
2017English

Maintenance Grouping for Multi-Component Systems With Availability Constraints and Limited Maintenance Teams

Reliability Engineering and System Safety
IndustrialRiskApplied MathematicsManufacturing EngineeringReliabilitySafetyQuality
2015English

Time-Extended Multi-Robot Coordination for Domains With Intra-Path Constraints

2009English

Modeling and Design of Multi - Agent Logistics Robot Scheduling Simulation Platform

2017English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy