Amanote Research

Amanote Research

    RegisterSign In

CMS Endcap RPC Gas Gap Production for Upgrade

Journal of Instrumentation - United Kingdom
doi 10.1088/1748-0221/7/11/p11013
Full Text
Open PDF
Abstract

Available in full text

Categories
InstrumentationMathematical Physics
Date

November 15, 2012

Authors
S K ParkS ChoiB HongY Gun JengM KangK S LeeK -S SimA ColaleoG PuglieseF LoddoC CalabriaM MaggiP VerwillingenU BerzanoC CarrilloA AleksandrovV GenchevP IaydjievM RodozovM ShopovaG Sultanov
Publisher

IOP Publishing


Related search

Fast Timing Measurement for CMS RPC Phase II Upgrade

2019English

Search for Heavy Stable Charged Particles at the CMS Experiment Using the RPC Phase II Upgrade

2019English

Aging Studies for the CMS RPC System

2018English

Longevity Studies on the CMS-RPC System

Journal of Instrumentation
InstrumentationMathematical Physics
2019English

The CMS Tracker Upgrade for HL-LHC

2017English

Module Production and Qualification for the Phase I Upgrade of the CMS Pixel Detector

2016English

Performance and Upgrade Plans for the CMS Detector

Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
High Energy PhysicsInstrumentationNuclear
2013English

Silicon Sensor Developments for the CMS Tracker Upgrade

Astroparticle, Particle, Space Physics and Detectors for Physics Applications
2012English

Upgrade of CMS Full Simulation for Run 2

EPJ Web of Conferences
AstronomyPhysics
2019English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy