Discussion of “Location Optimization of Tower Crane and Allocation of Material Supply Points in a Construction Site Considering Operating and Rental Costs” by Zahra Sadat Moussavi Nadoushani, Ahmed W. A. Hammad, and Ali Akbarnezhad
Journal of Construction Engineering and Management - ASCE - United States
doi 10.1061/(asce)co.1943-7862.0001557
Full Text
Open PDFAbstract
Available in full text
Date
November 1, 2018
Authors
Publisher
American Society of Civil Engineers (ASCE)