Amanote Research
Register
Sign In
Determining Job Completion Time Distributions in Stochastic Production Environments
doi 10.1109/wsc.1995.478867
Full Text
Open PDF
Abstract
Available in
full text
Date
Unknown
Authors
C.N. Hasan
M.L. Spearman
Publisher
IEEE
Related search
Production Technologies in Stochastic Continuous Time Models
Journal of Economic Dynamics and Control
Control
Applied Mathematics
Optimization
Econometrics
Economics
A Heuristic’s Job Order Gain in Pyramidal Preemptive Job Scheduling Problems for Total Weighted Completion Time Minimization
Information Technology and Management Science
Exact and Heuristic Methods for Minimizing the Total Completion Time in Job-Shops
Studies in Informatics and Control
Electronic Engineering
Electrical
Computer Science
Deriving Link Travel-Time Distributions via Stochastic Speed Processes
Transportation Science
Civil
Transportation
Structural Engineering
Acoustic Surveillance of Production Impairment With Real-Time Completion Monitoring
Development of Stochastic Model of Production Time and Estimation Technology for Standard Production Time in a Plate Mill
Tetsu-To-Hagane/Journal of the Iron and Steel Institute of Japan
Alloys
Condensed Matter Physics
Metals
Theoretical Chemistry
Materials Chemistry
Physical
Academics Job Satisfaction and Job Stress Across Countries in the Changing Academic Environments
Higher Education
Education
Law
The Total Time on Test Transform and the Excess Wealth Stochastic Orders of Distributions
Advances in Applied Probability
Applied Mathematics
Statistics
Probability
The Evolution of Patch Selection in Stochastic Environments
American Naturalist
Evolution
Ecology
Systematics
Behavior