Discussion. Results of the Application of Horse Power to Raising Water From the Working Shafts at Saltwood Tunnel, on the South-Eastern Railway, in 1842.
Minutes of the Proceedings of the Institution of Civil Engineers
doi 10.1680/imotp.1843.24643
Full Text
Open PDFAbstract
Available in full text
Date
January 1, 1843
Authors
Publisher
Thomas Telford Ltd.