Amanote Research
Register
Sign In
Ni/ZrO$sub 2$ HIGH TEMPERATURE THERMAL SWITCH PROGRAM. Final Report, February 1971--July 1971.
doi 10.2172/4666284
Full Text
Open PDF
Abstract
Available in
full text
Date
January 1, 1971
Authors
Unknown
Publisher
Office of Scientific and Technical Information (OSTI)
Related search
INTERIM REPORT FOR Ni/ZrO$sub 2$ HIGH TEMPERATURE THERMAL SWITCH REPORT, NOVEMBER 1970 TO JANUARY 1971.
Mechanical Properties Test. Quarterly Report, July 1971--September 1971
RADIOISOTOPE POWERED CARDIAC PACEMAKER PROGRAM. Phase II. Quarterly Progress Report, February 1, 1971--April 30, 1971.
Thermal Properties and Chemical Reactivity. Quarterly Report, October 1971--December 1971
Heat Source Capsule Fabrication Technology Program: Final Report, January 1971--March 1972.
SOUTHWEST EXPERIMENTAL FAST OXIDE REACTOR DEVELOPMENT PROGRAM. Twenty- Eighth Quarterly Report, February--April 1971.
High-Temperature Membranes for H{sub 2}S and SO{sub 2} Separations. Final Report
MULTI-HUNDRED WATT RADIOISOTOPE THERMOELECTRIC GENERATOR PROGRAM. PART II. Annual Report, July 1970--June 1971.
HIGH TEMPERATURE CHEMISTRY: FUNDAMENTALS OF EFFUSION AND THERMODYNAMICS OF MATERIALS. Final Report, June 1, 1961--August 31, 1971.