Amanote Research

Amanote Research

    RegisterSign In

20-Mw-Long-Pulse Klystron Modulator

doi 10.1109/ppps.2001.1001772
Full Text
Open PDF
Abstract

Available in full text

Date

Unknown

Authors
W. Kaesler
Publisher

IEEE


Related search

CLIC 50 MW L-Band Multi-Beam Klystron

AIP Conference Proceedings
AstronomyPhysics
2006English

Recent Upgrade of the Klystron Modulator at SLAC

2011English

1.2 Mw Klystron for Asymmetric Storage Ring B Factory

English

Klystron Modulator Operation and Upgrades for the APS Linac

English

12-Pulse LCI Synchronous Drive for a 20 MW Compressor Modeling, Simulation and Measurements

English

20-Mw Magnicon for ILC

2006English

Sefor Core I Test Results to 20 Mw.

1971English

Modulated 20 T-Pulse Generator

The Journal of the Institute of Television Engineers of Japan
1968English

Rationale for a Spallation Neutron Source Target System Test Facility at the 1-Mw Long-Pulse Spallation Source

1995English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy