Amanote Research
Register
Sign In
Key Risk Index Identification of UHV Project Construction Based on Improved Rough Set Model
Science Journal of Energy Engineering
doi 10.11648/j.sjee.s.2015030401.12
Full Text
Open PDF
Abstract
Available in
full text
Date
January 1, 2015
Authors
Sen Guo
Publisher
Science Publishing Group
Related search
Study on the Early Warning of PPP Project Risk Based on Rough Set and BP Neural Network
The Extract Method of Engineering Management Index Based on Rough Set
Multi-Index Classification Model for Loess Deposits Based on Rough Set and BP Neural Network
Polish Journal of Environmental Studies
Environmental Chemistry
Environmental Science
Building a Rough Sets-Based Prediction Model for Classifying Large-Scale Construction Projects Based on Sustainable Success Index
Engineering, Construction and Architectural Management
Building
Management
Business
Civil
Structural Engineering
Construction
Architecture
Accounting
Risk Analysis Technique on Inconsistent Interview Big Data Based on Rough Set Approach
Journal of Data Analysis and Information Processing
Risk Identification and Applying Risk Management Technique in Construction Project
International Journal for Research in Applied Science and Engineering Technology
Research on DNA Encoding Based on Rough Set
Information Technology Journal
Research on Course Recommendation Based on Rough Set
On Characterization of Relation Based Rough Set Algebras