Applying an Overlapped Design Schedule Based Dependency Structure Matrix to Minimize Project Makespan
doi 10.2991/icoiese-18.2019.33
Full Text
Open PDFAbstract
Available in full text
Date
January 1, 2019
Authors
Publisher
Atlantis Press
Available in full text
January 1, 2019
Atlantis Press