Feasibility Study for an Advanced Coal Fired Heat Exchanger/Gas Turbine Topping Cycle for a High Efficiency Power Plant. Technical Report, January 1, 1993--March 31, 1993
doi 10.2172/10143781
Full Text
Open PDFAbstract
Available in full text
Date
April 1, 1993
Authors
Publisher
Office of Scientific and Technical Information (OSTI)