Amanote Research

Amanote Research

    RegisterSign In

Risk Control in the Well Drilling Phase: BOP System Reliability Assessment

doi 10.1201/b19094-101
Full Text
Open PDF
Abstract

Available in full text

Date

September 3, 2015

Authors
G StrandM Lundteigen
Publisher

CRC Press


Related search

Well Control During Drilling and Workover Operations

Journal of Petroleum and Mining Engineering
2020English

Impact of Drilling Parameters on Depth of Oil Well in Monitoring and Control System

Current Journal of Applied Science and Technology
2018English

Deep Well Drilling

Nature
Multidisciplinary
1937English

Advances in Distribution System Reliability Assessment

English

Phase 2 Drilling Operations at the Long Valley Exploratory Well (LVF 51--20)

1992English

Risk Assessment Methods of a Water Supply System in Terms of Reliability and Operation Cost

2014English

Cryptographic Control for Risk Assessment on Unix Operating System-I

International Journal in Foundations of Computer Science & Technology
2013English

Research on the Reliability of Elevator Control System

DEStech Transactions on Materials Science and Engineering
2017English

Reliability of the Electromechanical Delay Components Assessment During the Relaxation Phase

Physiology Journal
2013English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy