Construction of a Building Tower Using the Integrated BIM Platform With Timelines for Optimization of Time

ITEGAM- Journal of Engineering and Technology for Industrial Applications (ITEGAM-JETIA)
doi 10.5935/2447-0228.20190023
Full Text
Abstract

Available in full text

Date
Authors
Publisher

GN1 Genesis Network