Improving the Reliability of a Bridge Management System (BMS) Using an ANN-based Backward Prediction Model (BPM)
Automation in Construction - Netherlands
doi 10.1016/j.autcon.2008.02.008
Full Text
Open PDFAbstract
Available in full text
Date
August 1, 2008
Authors
Publisher
Elsevier BV