Research on Fuel Tank Model Selection of LNG Power Ship Based on Evaporation Rate Control and Construction Cost
doi 10.2991/ismems-16.2016.66
Full Text
Open PDFAbstract
Available in full text
Date
January 1, 2016
Authors
Publisher
Atlantis Press
Available in full text
January 1, 2016
Atlantis Press