Amanote Research

Amanote Research

    RegisterSign In

Initial Operation of the Standard Pile

doi 10.2172/4369826
Full Text
Open PDF
Abstract

Available in full text

Date

December 1, 1953

Authors
R.C. AxtmannL.A. HeinrichR.C. RobinsonO.A. TowlerJ.W. Wade
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Recalibration of the X-10 Standard Graphite Pile

1952English

Initial Operation of the 2xii Experiment.

1972English

HRP In-Pile Corrosion Test Loops, Operation of In-Pile Loop L-2-19

1958English

Initial Operation of the New Bevatron Local Injector

IEEE Transactions on Nuclear Science
Electronic EngineeringNuclearNuclear EnergyHigh Energy PhysicsEngineeringElectrical
1985English

Initial Operation of the Argonne Superconducting Heavy-Ion Linac

IEEE Transactions on Nuclear Science
Electronic EngineeringNuclearNuclear EnergyHigh Energy PhysicsEngineeringElectrical
1979English

Initial Operation and Performance of the PDX Neutral-Beam Injection System

1982English

Initial Testing and Operation of the Argonne Low Power Reactor (Alpr)

1959English

Initial SVE Well Testing for the A-Area Miscellaneous Rubble Pile (ARP) Trenches Area

2004English

Initial Operation of a High-Power Whispering-Gallery-Mode Gyrotron

1987English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy