A Basic Study on the Present Condition and the Directionality of Revision of Planned Road Without Any Improvement for Long Time –As a Case of the Planned Road “Taisyo Line” in Echizen City–
INFRASTRUCTURE PLANNING REVIEW
doi 10.2208/journalip.27.391
Full Text
Open PDFAbstract
Available in full text
Date
January 1, 2010
Authors
Publisher
Japan Society of Civil Engineers