Amanote Research

Amanote Research

    RegisterSign In

Integrated Upstream Parasitic Event Building Architecture for BTeV Level 1 Pixel Trigger System

doi 10.1109/rtc.2005.1547530
Full Text
Open PDF
Abstract

Available in full text

Date

January 1, 2005

Authors
M. WangE. GottschalkD. ChristianX. LiZ. ShiV. Pavlicek
Publisher

IEEE


Related search

Data Analysis at Level-1 Trigger Level

2018English

Electronics for CMS Endcap Muon Level-1 Trigger System Phase-1 and HL LHC Upgrades

Journal of Instrumentation
InstrumentationMathematical Physics
2017English

Demonstrator of the Belle II Online Tracking and Pixel Data Reduction on the High Level Trigger System

IEEE Transactions on Nuclear Science
Electronic EngineeringNuclearNuclear EnergyHigh Energy PhysicsEngineeringElectrical
2015English

The ATLAS Level-1 Trigger System With 13TeV Nominal LHC Collisions

Springer proceedings in physics
High Energy PhysicsNuclear
2018English

High Level Trigger System for the LHC ALICE Experiment

Lecture Notes in Computer Science
Computer ScienceTheoretical Computer Science
2002English

The Upgrade of the PreProcessor System of the ATLAS Level-1 Calorimeter Trigger

Journal of Instrumentation
InstrumentationMathematical Physics
2012English

The ATLAS High Level Trigger Steering Framework and the Trigger Configuration System

2011English

Software-Based Data Acquisition System for Level-1 End-Cap Muon Trigger in Atlas Run-3

EPJ Web of Conferences
AstronomyPhysics
2019English

Upgrade of the ATLAS Level-1 Calorimeter Trigger

2014English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy