An Analysis of Pump Power Calculation of Converted Bandung Triga Reactor With Pipe Routing Through Delay Tank
JURNAL TEKNOLOGI REAKTOR NUKLIR TRI DASA MEGA
doi 10.17146/tdm.2018.20.3.4623
Full Text
Open PDFAbstract
Available in full text
Date
November 2, 2018
Authors
Publisher
National Atomic Energy Agency of Indonesia (BATAN)