Amanote Research

Amanote Research

    RegisterSign In

Design, Testing and Operation of a System of Proportional Chambers for the E835 Experiment at Fermilab

doi 10.2172/948151
Full Text
Open PDF
Abstract

Available in full text

Date

November 1, 1996

Authors
Paolo Rumerio
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Nuclotron Beam Momentum Estimation Using Multiwire Proportional Chambers and Drift Chambers in the BM@N Experiment

EPJ Web of Conferences
AstronomyPhysics
2018English

The DO̸ Experiment at the Fermilab Tevatron Collider

AIP Conference Proceedings
AstronomyPhysics
1993English

Mixed PBAR Source Operation at the Fermilab Tevatron

English

Indiana University Proportional Chambers

1973English

Letter of Intent: A Muon to Electron Conversion Experiment at Fermilab

2007English

Development of Large Planar Proportional Chambers

Nuclear Instruments and Methods
Medicine
1980English

Expression of Interest: A Muon to Electron Conversion Experiment at Fermilab

2007English

The Main Injector Particle Production Experiment (MIPP) at Fermilab

Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
High Energy PhysicsInstrumentationNuclear
2005English

Main Injector Particle Production Experiment (MIPP) at Fermilab

2011English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy