Amanote Research

Amanote Research

    RegisterSign In

Tutorial T3B: Engineering Change Order (ECO) Phase Challenges and Methodologies for High Performance Design

doi 10.1109/vlsid.2014.118
Full Text
Open PDF
Abstract

Available in full text

Date

January 1, 2014

Authors
Sridhar RangarajanPinaki ChakrabartiSourav SahaisAyan DattaAdarsh Subramanya
Publisher

IEEE


Related search

Phase-Change Memory: Performance, Roles and Challenges

2018English

Sustainable Engineering and Eco Design

2012English

A Framework for Evaluating High-Level Design Methodologies for High-Performance Reconfigurable Computers

IEEE Transactions on Parallel and Distributed Systems
HardwareComputational TheorySignal ProcessingArchitectureMathematics
2011English

Eco-Innovative Design Method for Process Engineering

Computers and Chemical Engineering
Computer Science ApplicationsChemical Engineering
2012English

Business Process Re-Engineering: Phases and Change Methodologies

Journal of Independent Studies and Research-Management, Social Sciences and Economics
2003English

High-Performance Simulation and Simulation Methodologies

Simulation
Computer GraphicsSimulationComputer-Aided DesignModelingMathematicsSoftware
2013English

High-Order PLL Design With Constant Phase Margin

2010English

Keynote Talk: Opportunities and Challenges for High Performance Microprocessor Designs and Design Automation

2013English

Eco-Engineering for Clarity

English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy