Analysis Cost Overruns, Delays and Risk Involved in Construction Management Using Primavera
International Journal of Engineering and Technology(UAE) - United Arab Emirates
doi 10.14419/ijet.v7i3.10.15651
Full Text
Open PDFAbstract
Available in full text
Categories
Date
July 15, 2018
Authors
Publisher
Science Publishing Corporation