Amanote Research
Register
Sign In
Simulation Based Priority Rules for Scheduling of a Flow Shop With Simultaneously Loaded Stations
doi 10.7148/2013-0775
Full Text
Open PDF
Abstract
Available in
full text
Date
May 27, 2013
Authors
Frank Herrmann
Publisher
ECMS
Related search
An Approach to Develop a Dynamic Job Shop Scheduling by Fuzzy Rule Based System and Comparative Study With the Traditional Priority Rules
American Journal of Engineering and Applied Sciences
Geotechnical Engineering
Energy Engineering
Engineering Geology
Engineering
Chemical Engineering
Power Technology
Environmental Engineering
Computer Science
A Multipopulation PSO Based Memetic Algorithm for Permutation Flow Shop Scheduling
The Scientific World Journal
Biochemistry
Medicine
Genetics
Molecular Biology
Environmental Science
Flexible Flow Shop Scheduling With Stochastic Processing Times: A Decomposition-Based Approach
Computers and Industrial Engineering
Engineering
Computer Science
A Genetic Algorithm for a Bicriteria Flow-Shop Scheduling Problem
Transactions of the Institute of Systems, Control and Information Engineers
A Note on Heuristics of Flow-Shop Scheduling
Operations Research
Management Science
Computer Science Applications
Operations Research
Rule Based Heuristic Approach for Minimizing Total Flow Time in Permutation Flow Shop Scheduling
Tehnicki Vjesnik
Engineering
A Hybrid EDA With GA for the Permutation Flow Shop Scheduling Problem
Operations Research and Fuzziology
Heuristics for No-Wait Flow Shop Scheduling Problem
International Journal of Industrial Engineering Computations
Industrial
Manufacturing Engineering
The Hybrid Flow Shop Scheduling Problem
European Journal of Operational Research
Information Systems
Simulation
Management Science
Management
Computer Science
Modeling
Operations Research