Amanote Research

Amanote Research

    RegisterSign In

Multivariate Information Dynamic Monitoring System Application of Tunnel Construction Process Model Test

Archives of Civil Engineering - Poland
doi 10.1515/ace-2015-0087
Full Text
Open PDF
Abstract

Available in full text

Categories
CivilStructural Engineering
Date

September 1, 2016

Authors
Q. LiuJ. ChenL. WeiP. HuangY. LuoX. Pu
Publisher

Walter de Gruyter GmbH


Related search

Liquid Effluent Monitoring Information System (LEMIS) System Construction

1994English

Construction Process Simulation in Tunnel Construction – a Prerequisite for Automation

2018English

Intelligent Visualization System Analysis of Tunnel Monitoring

2016English

A Framework for Multivariate Process Monitoring and Diagnosis

Applied Mechanics and Materials
2013English

Analysis of Inland Immersed Tunnel Health Monitoring System

DEStech Transactions on Materials Science and Engineering
2017English

Monitoring and Control Process of Construction Projects

2019English

From Business Process Model to Application System — Developing an Information System With the House of Business Engineering (HOBE)

Lecture Notes in Computer Science
Computer ScienceTheoretical Computer Science
1999English

Dynamic Risk Assessment Method of Tunnel Collapse Based on Attribute Interval Assessment Model and Application

Polish Journal of Environmental Studies
Environmental ChemistryEnvironmental Science
2020English

Mathematical Model and Algorithm for Monitoring Information System Parameters

Omsk Scientific Bulletin
2018English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy