Technical Evaluation of the Electrical, Instrumentation, and Control Design Aspects of the Low Temperature Overpressure Protection System for the Maine Yankee Nuclear Power Plant
doi 10.2172/6078522
Full Text
Open PDFAbstract
Available in full text
Date
August 1, 1979
Authors
Publisher
Office of Scientific and Technical Information (OSTI)