A New Approach in the Design of the Temporary Support for the Flysch Geomassif in the Beskid Tunnel Costruction
Mining Journal of Kryvyi Rih National University
doi 10.31721/2306-5435-2017-1-102-67-73
Full Text
Open PDFAbstract
Available in full text
Date
January 1, 2017
Authors
Publisher
Kryvyi Rih National University