Amanote Research

Amanote Research

    RegisterSign In

Risk Analysis of Concrete Pouring Operation During High Dam Construction

Revista de la Facultad de Ingenieria - Venezuela
doi 10.21311/002.31.8.21
Full Text
Open PDF
Abstract

Available in full text

Categories
EarthEngineeringPlanetary Sciences
Date

December 31, 2016

Authors

Unknown

Publisher

Facultad De Ingenieria Universidad Del Zulia


Related search

Reliability Analysis of Built Concrete Dam

Revista IBRACON de Estruturas e Materiais
2019English

Finite Element Analysis of Reinforced Concrete Aqueduct During Operation Period

2014English

Simulation Analysis on Mass Concrete Temperature Field of Lock Floor Layered Pouring

Journal of Environmental Science and Engineering A
2016English

Electromagnetic Modeling and Characterization of Steel Fiber Reinforced Concrete During the Pouring Process

2009English

Seismic Analysis of the High Arch Concrete Dam of the Water Power Plant "Piva"

Tehnicki Vjesnik
Engineering
2016English

Stress and Deformation Analysis of a Center Core-Type Rockfill Dam During Construction

Doboku Gakkai Ronbunshu
2003English

Report on an Anomaly in the Behavior of a Large Earth-Concrete Dam in Operation - The Case of Castanhão Dam

Geotecnia
2017English

Simulation of Construction Process Combining Steel Truss Integral Lifting With Concrete Pouring for SRC Conversion Layer Structure

2017English

Dam Instability Risk Analysis of Damaged Spillway

Engineering Journal
Engineering
2013English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy