Amanote Research

Amanote Research

    RegisterSign In

Anticipated Dose to Workers for Plutonium Stabilization and Handling at PFP Project W-460

doi 10.2172/798667
Full Text
Open PDF
Abstract

Available in full text

Date

November 30, 1999

Authors
J.T. LILLY
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

QA Program Plan Plutonium Stabilization and Handling Project W-460

1999English

Functional Design Criteria Plutonium Stabilization and Handling (PUSH) Project W-460

1999English

Evaluation of PFP Furnace Systems for Thermal Stabilization of Washed High Chloride Plutonium Oxide Items

2002English

Notice of Construction for the Magnesium Hydroxide Precipitation Process at the Plutonium Finishing Plant (PFP)

1999English

Plutonium Finishing Plant (PFP) HVAC System Component Index

2000English

Plutonium Stabilization and Packaging System

1996English

Plutonium Finishing Plant (PFP) Plutonium & Uranium Oxide Characterization of Items With Less Than 30 Weight Percent Plutonium

2002English

Plutonium Finishing Plant (Pfp) Generalized Geometry Holdup Calculations & Total Measurement Uncertainty

2005English

Plutonium Finishing Plant. Interim Plutonium Stabilization Engineering Study

1995English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy