Amanote Research

Amanote Research

    RegisterSign In

Throughput-Delay Analysis of Mobile Ad-Hoc Networks With a Multi-Copy Relaying Strategy

doi 10.1109/sahcn.2004.1381918
Full Text
Open PDF
Abstract

Available in full text

Date

Unknown

Authors
R.M. de MoraesH.R. SadjadpourJ.J. Garcia-Luna-Aceves
Publisher

IEEE


Related search

Restricted Mobility Improves Delay-Throughput Tradeoffs in Mobile Ad Hoc Networks

IEEE Transactions on Information Theory
Computer Science ApplicationsInformation SystemsLibraryInformation Sciences
2010English

Smooth Trade-Offs Between Throughput and Delay in Mobile Ad Hoc Networks

IEEE Transactions on Mobile Computing
Computer NetworksElectronic EngineeringSoftwareElectricalCommunications
2012English

Relative Fairness and Optimized Throughput for Mobile Ad Hoc Networks

2008English

Interest-Driven Forwarding for Delay-Tolerant Mobile Ad Hoc Networks

2013English

Outage Probability of Wireless Ad Hoc Networks With Cooperative Relaying

2012English

Multi-Path Admission Control for Mobile Ad Hoc Networks

ACM SIGMOBILE Mobile Computing and Communications Review
2004English

Mobile Ad-Hoc Networks: MANET

Trendovi u poslovanju
2018English

Representing Multi-Value Time in Mobile Ad Hoc Networks (MANETs)

2009English

Connectivity Analysis of Cognitive Radio Ad-Hoc Networks With Multi-Pair Primary Networks

Sensors
InstrumentationInformation SystemsElectronic EngineeringBiochemistryAnalytical ChemistryMolecular Physics,ElectricalAtomicMedicineOptics
2019English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy