An Integrated Optimization of Quality Control Chart Parameters and Preventive Maintenance Using Markov Chain
Advances in Production Engineering And Management - Slovenia
doi 10.14743/apem2019.1.307
Full Text
Open PDFAbstract
Available in full text
Categories
Date
March 23, 2019
Authors
Publisher
Production Engineering Institute (PEI), Faculty of Mechanical Engineering