An Integrated Optimization of Quality Control Chart Parameters and Preventive Maintenance Using Markov Chain

Advances in Production Engineering And Management - Slovenia
doi 10.14743/apem2019.1.307
Full Text
Abstract

Available in full text

Date
Authors
Publisher

Production Engineering Institute (PEI), Faculty of Mechanical Engineering