Amanote Research
Register
Sign In
The Algorithm and Simulation of Multi-Objective Sequence and Balancing Problem for Mixed Mode Assembly Line
International Journal of Simulation Modelling
- Austria
doi 10.2507/ijsimm16(2)co10
Full Text
Open PDF
Abstract
Available in
full text
Categories
Modeling
Computer Science Applications
Simulation
Date
June 15, 2017
Authors
B. Yang
W. Chen
C. Lin
Publisher
DAAAM International
Related search
A Multi-Objective Method for Solving Assembly Line Balancing Problem
Decision Science Letters
Decision Sciences
Integrated Optimization of Mixed-Model Assembly Sequence Planning and Line Balancing Using Multi-Objective Discrete Particle Swarm Optimization
Artificial Intelligence for Engineering Design, Analysis and Manufacturing: AIEDAM
Industrial
Artificial Intelligence
Manufacturing Engineering
Heuristic Algorithm for Type II Two-Sided Assembly Line Rebalancing Problem With Multi-Objective
MATEC Web of Conferences
Materials Science
Engineering
Chemistry
A Study on Mixed-Model Assembly Line Balancing Problem.
Seimitsu Kogaku Kaishi/Journal of the Japan Society for Precision Engineering
Mechanical Engineering
A Goal Programming Approach to Mixed-Model Assembly Line Balancing Problem
International Journal of Production Economics
Management
Business
Economics
Manufacturing Engineering
Management Science
Industrial
Accounting
Econometrics
Operations Research
Model and Migrating Birds Optimization Algorithm for Two-Sided Assembly Line Worker Assignment and Balancing Problem
Soft Computing
Geometry
Software
Theoretical Computer Science
Topology
A Modified Artificial Bee Colony Algorithm to Optimise Integrated Assembly Sequence Planning and Assembly Line Balancing
Journal of Mechanical Engineering and Sciences
Mechanics of Materials
Industrial
Mechanical Engineering
Energy Engineering
Fuel Technology
Manufacturing Engineering
Computational Mechanics
Power Technology
Assembly Line Balancing Optimization Based on Simulation
Design and Comparison of Genetic Algorithms for Mixed-Model Assembly Line Balancing Problem With Original Task Times of Models
American Journal of Industrial and Business Management