Amanote Research

Amanote Research

    RegisterSign In

Functional Design Criteria for the 242-A Evaporator and PUREX (Plutonium-Uranium Extraction) Plant Condensate Interim Retention Basin

doi 10.2172/6466460
Full Text
Open PDF
Abstract

Available in full text

Date

January 1, 1990

Authors
C.C. Cejka
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

242-A Evaporator/Plutonium Uranium Extraction (PUREX) Effluent Treatment Facility (ETF) Nonradioactive Air Emission Test Report

1996English

1998 242-A Interim Evaporator Tank System Integrity Assessment Plan

1998English

Interim Operation of the Purex 241-A Waste Tank Farm Condensate Disposal Facility

1956English

242-A Evaporator/Liquid Effluent Retention Facility Data Quality Objectives

1994English

Plutonium Finishing Plant. Interim Plutonium Stabilization Engineering Study

1995English

Facility Effluent Monitoring Plan for the Plutonium-Uranium Extraction Facility

1993English

Facility Effluent Monitoring Plan for the Plutonium Uranium Extraction Facility

1997English

Functional Design Criteria Plutonium Stabilization and Handling (PUSH) Project W-460

1999English

DBBP Solvent Extraction Recovery of Neptunium and Plutonium From Purex 1ww Solution.

1969English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy