Amanote Research

Amanote Research

    RegisterSign In

&Quot;CONFIRMATORY SURVEY RESULTS FOR THE ABB COMBUSTION ENGINEERING SITE WINDSOR, CONNECTICUT DCN 5158-Sr-02-2

doi 10.2172/1096529
Full Text
Open PDF
Abstract

Available in full text

Date

March 25, 2013

Authors
WADE C ADAMS
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Estimation of Uranium and Cobalt-60 Distribution Coefficients and Uranium-235 Enrichment at the Combustion Engineering Company Site in Windsor, Connecticut

1996English

&Quot;INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE FORD NUCLEAR REACTOR, REVISION 1, ANN ARBOR, MICHIGAN

2013English

Map Showing Thickness of Principal Clay Unit, Windsor Locks Quadrangle, Connecticut

1974English

Radiological Survey Results for the Peek Street Site Properties, Schenectady, New York

1992English

Motivation Measurement Model to Learn Basic Buliding Construction and Survey Engineering Using Confirmatory Factor Analysis

Jurnal Pengukuran Psikologi dan Pendidikan Indonesia (JP3I)
2019English

The Windsor Locks, Connecticut Tornado of 3 October 1979: An Analysis of an Intermittent Severe Weather Event

Monthly Weather Review
Atmospheric Science
1987English

Crystal Structures of Sr(ClO4)2·3H2O, Sr(ClO4)2·4H2O and Sr(ClO4)2·9H2O

Acta Crystallographica Section E Structure Reports Online
2014English

Low NOxPremixed Combustion of MBTU Fuels Using the ABB Double Cone Burner (EV Burner)

1994English

Combustion Engineering, Inc. [LMFBR]

1980English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy