Amanote Research
Register
Sign In
Preparing Accelerator Systems for the RHIC Sextant Commissioning
doi 10.1109/pac.1997.749557
Full Text
Open PDF
Abstract
Available in
full text
Date
Unknown
Authors
D. Trbojevic
F. Epilat
L. Ahrens
D. Barton
T. Clifford
R. Connoly
W. Fischer
M. Harrison
W. MacKay
R. Olsen
S. Peggs
T. Satogata
S. Tepikian
P. Thompson
C.G. Trahern
R. Witkover
Publisher
IEEE
Related search
RHIC Sextant Test: Accelerator Systems and Performance
The Commissioning Status of RHIC
Comparison of Accelerator Codes for a RHIC Lattice
How Robust Will the RHIC Lattice Be During Commissioning
Commissioning and Operating Experience With the LISA Superconducting Accelerator
Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
High Energy Physics
Instrumentation
Nuclear
A Model of RHIC Using the Unified Accelerator Libraries
Photon Beam Commissioning of an Elekta Synergy Linear Accelerator
Polish Journal of Medical Physics and Engineering
Nuclear Medicine
Radiology
Imaging
Biophysics
RHIC Warm-Bore Systems
Open Hardware for CERN's Accelerator Control Systems
Journal of Instrumentation
Instrumentation
Mathematical Physics