Amanote Research

Amanote Research

    RegisterSign In

Polarimetry at RHIC: RHIC Polarized Beam in Run 2011

doi 10.2172/1104832
Full Text
Open PDF
Abstract

Available in full text

Date

October 15, 2013

Authors

Unknown

Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Absolute Polarimetry of Proton Beams at RHIC

2016English

Beam Scrubbing for RHIC Polarized Proton Operation

2003English

Acceleration of Polarized Protons at RHIC

AIP Conference Proceedings
AstronomyPhysics
2003English

Overview of Beam Studies at RHIC During the Year 2000 Run

English

Polarized Proton Beams in Rhic

2011English

Luminosity Increase at the Incoherent Beam-Beam Limit in RHIC

2003English

RHIC Beam Synchronous Trigger Module

English

Correction to AD/RHIC-47, Beam Transfer From AGS to RHIC

1988English

Beam Loss and Emittance Growth of Colliding Proton Beams During RHIC Run-5

2006English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy