Amanote Research
Register
Sign In
Development and Production Cost Analysis for Subatmospheric Brayton System for Brayton-Cycle Heat-Recovery System, Characterization Program, Subtask A. 4. 2. 4 of Phase I Program Plan
doi 10.2172/5325667
Full Text
Open PDF
Abstract
Available in
full text
Date
June 30, 1980
Authors
Unknown
Publisher
Office of Scientific and Technical Information (OSTI)
Related search
Brayton-Cycle Heat-Recovery System Characterization Program. Component Test Plan
Brayton-Cycle Heat Recovery System Characterization Program. Glass-Furnace Facility Test Plan
Program Plan for the Brayton Isotope Power System. Phase I. Design, Fabrication and Test of the Brayon Isotope Power System
Brayton Power Conversion System
Test Plan: Brayton Isotope Power System Ground Demonstration System (BIPS-GDS)
Energy Analysis of the S-Co2 Brayton Cycle With Improved Heat Regeneration
Processes
Technology
Process Chemistry
Chemical Engineering
Bioengineering
Preliminary Design Review: Brayton Isotope Power System
Modeling for Organic Rankine Cycle Waste Heat Recovery System Development
Brayton Isotope Power System. Volume II. System Evaluation Attributes