Amanote Research

Amanote Research

    RegisterSign In

Construction of Bending Magnet Beamline at the APS for Environmental Studies. Progress Report, September 1996--September 1997

doi 10.2172/13432
Full Text
Open PDF
Abstract

Available in full text

Date

January 1, 1997

Authors
E.A. Stern
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Declassification Productivity Research Center Annual Progress Report {Number_sign}8, September 26, 1996--September 25, 1997

1997English

Justification for the Development of a Bending Magnet Beamline at Sector 10 at the APS.

2006English

Extraction Studies. Final Report, May 6, 1996--September 30, 1997

1997English

The Production and Destruction of Negative Ions. Progress Report, September 1, 1996--August 31, 1997

1997English

Heavy-Section Steel Irradiation Program. Progress Report, April 1996--September 1996

1997English

[Sensitivity and Uncertainty Analysis of Atmospheric Photochemistry Models. Progress Report, September 30, 1995--September 22, 1996]

1996English

Site Characterization Progress Report: Yucca Mountain, Nevada. Progress Report Number 17, April 1, 1997--September 30, 1997

1998English

Delays in Nuclear Power Plant Construction. Progress Report, September 15, 1976--September 14, 1977

1977English

Hydrogen Systems Analysis, Education, and Outreach. Annual Report, August 1996--September 1997

1997English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy