Perbandingan Nilai Overall Equipment Effectiveness (Oee) Mesin Packer Lama Dan Mesin Packer Baru Pada Packing Plant Indarung (Ppi) Pt. Semen Padang
Jurnal Sains dan Teknologi: Jurnal Keilmuan dan Aplikasi Teknologi Industri
doi 10.36275/stsp.v16i2.39
Full Text
Open PDFAbstract
Available in full text
Date
December 15, 2016
Authors
Publisher
Sekolah Tinggi Teknologi Industri (STTIND) Padang