Amanote Research

Amanote Research

    RegisterSign In

Determination of Reactivity Coefficients and Rod Calibration of D Pile. Interim Report on Production Test No. 105-97-P

doi 10.2172/10158473
Full Text
Open PDF
Abstract

Available in full text

Date

April 25, 1947

Authors
F.E. Kruesi
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Production Test No. 105-522-E, Examination of Pile Process Tubes

1953English

Production Test No. 105-168-P: Supplement D Addition of Carbon Dioxide to B and F Piles

1948English

Production Test Number 105-634-A In-Pile Cocked Slug Tests

1956English

Production Test 105-389-P Graphite Sample Boring From Process Channels. Final Report

1951English

Final Report on Production Test No. 105-551-Sr -- The Fission Gas Experiment, KAPL-M-108

1954English

Production Test No. 305-9-P, Poisoning Effectiveness and Uniformity of Myrnalloy Slugs. Final Report

1946English

Production Test PT-IP-810 Installation of Flat Aluminum Horizontal Control Rod, D Reactor

1965English

The Effect of Gaps on Pile Reactivity

1952English

On the Determination of Transmissibility and Storage Coefficients From Pumping Test Data

Transactions, American Geophysical Union
1952English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy