Amanote Research

Amanote Research

    RegisterSign In

Field Performance Testing of an Uprated Gas Reinjection Compressor/Turbine Train

doi 10.1115/91-gt-048
Full Text
Open PDF
Abstract

Available in full text

Date

June 3, 1991

Authors
John M. KleinPatrick A. Draughon
Publisher

American Society of Mechanical Engineers


Related search

Turbine-Compressor Train Uprated for 30% Increase in Gas Flow

1991English

Performance Testing of Gas Turbine Compressor Sets

1982English

A New Uprated Turbine for the GT8 and GT8C Gas Turbine Family

1994English

An Investigation on Failure Analysis of Titanium Gas Turbine Compressor Blades

Materials Science Forum
Mechanics of MaterialsMaterials ScienceCondensed Matter PhysicsMechanical Engineering
2007English

Creation of Perspective Small-Size Gas-Turbine Installations With Independent Rotating Speeds Compressor and Turbine

Bulletin of Bryansk state technical university
2017English

Turbine Rebuild Effects on Gas Turbine Performance

1992English

Design and Test of the FT8 Gas Turbine Low Pressure Compressor

1989English

Boosting Gas Turbine Power Plants Through Optimal Water Injection Into Compressor

St. Petersburg State Polytechnical University Journal
2015English

Thermodynamic Analysis of a Steam Injected and Recuperated Gas Turbine Air Compressor

2012English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy