Applying the Anticipatory Failure Determination at a Very Early Stage of a System’S Development: Overview and Case Study
Multidisciplinary Aspects of Production Engineering
doi 10.2478/mape-2018-0027
Full Text
Open PDFAbstract
Available in full text
Date
September 1, 2018
Authors
Publisher
Walter de Gruyter GmbH