Amanote Research
Register
Sign In
Industrial Fuel Gas Demonstration Plant Program: Bid Packages for Long-Lead Items
doi 10.2172/12185857
Full Text
Open PDF
Abstract
Available in
full text
Date
January 1, 1979
Authors
Unknown
Publisher
Office of Scientific and Technical Information (OSTI)
Related search
Industrial Fuel Gas Demonstration Plant Program: Staffing Plan. Deliverable No. 34
Industrial Fuel Gas Demonstration Plant Program. Phase I. Report/Final Report (Deliverable No. 5). [Identification of Phase I Activities, Deliverable Items and Dates Submitted]
Fuel Gas Demonstration Plant Program: Small-Scale Industrial Project. Demonstration Plant Design and Economic Evaluation, Phase I. Interim Report. [Little Text; Specifications, Flow Sheets, Diagrams, Etc]
Industrial Fuel Gas Demonstration Plant Program. Conceptual Design and Evaluation of Commercial Plant. Volume III. Economic Analyses (Deliverable Nos. 15 and 16)
Important Fuel-Related Items for 1984 1. 5. Gas.
Journal of the Fuel Society of Japan
Industrial- And Utility-Scale Coal-Water Fuel Demonstration Projects
Demonstration of CO2 Conversion to Synthetic Transport Fuel at Flue Gas Concentrations
Frontiers in Energy Research
Energy Engineering
Renewable Energy
Economics
Fuel Technology
the Environment
Sustainability
Power Technology
Econometrics
Economic and Technical Assessment of Wood Biomass Fuel Gasification for Industrial Gas Production
Development of a Dual-Fuel Injection System for Lean Premixed Industrial Gas Turbines