Amanote Research
Register
Sign In
LHCb Run 2 Trigger and Upgrade Reconstruction
doi 10.22323/1.340.0225
Full Text
Open PDF
Abstract
Available in
full text
Date
August 2, 2019
Authors
Mark Whitehead
Publisher
Sissa Medialab
Related search
LHCb Upgrade
Real-Time Physics, Alignment and Reconstruction in the LHCb Trigger
Vertex Reconstruction and Tracking in the Trigger Algorithm for LHCB
LHCb Upgrade Plans
Nuclear Physics B - Proceedings Supplements
The LHCb VELO Upgrade
The LHCb RICH Upgrade
The LHCb Upgrade II
PID Strategy and Performance at LHCb in Run 2
Design and Performance of the LHCb Detector and Full Real-Time Reconstruction in Run 2 of the LHC