Amanote Research

Amanote Research

  • Register
  • Sign In

Ecological Evaluation of Proposed Discharge of Dredged Material From Oakland Harbor Into Ocean Waters (Phase 3 B of -42-Foot Project)

doi 10.2172/7236553

Full Text

Abstract

Available in

Date

June 1, 1992

Authors

N.P. KohnJ.A. WardH.L. MayhewJ.Q. WordE.S. BarrowsS.M. GoodwinL.F. Lefkovitz

Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Tier 1 Ecological Evaluation of Proposed Discharge of Dredged Material From Oakland Harbor Into Ocean Waters

1994English

Ecological Evaluation of Proposed Dredged Material From Oakland Harbor Intensive Study, IC-1 and OC4-B

1993English

Evaluation of Dredged Material Proposed for Ocean Disposal From Shark River Project Area

1996English

Evaluation of Dredged Material Proposed for Ocean Disposal From MOTBY

1996English

Ecological Evaluation of Oakland Harbor Phase 3-38-Foot Composites Relative to the Alcatraz Island Environs (R-Am)

1992English

Evaluation of Dredged Material Proposed for Ocean Disposal From Liberty Island Anchorage, New York

1966English

Use of Engineering With Nature® Concepts on the Savannah Harbor Navigation Project, Dredged Material Containment Areas, Savannah, GA

2020English

Long-Term Management Strategy for Dredged Material Disposal for Naval Facilities at Pearl Harbor, Hawaii Phase III - Analysis of Alternatives and Development of an LTMS

2000English

Evaluation of Loading and Dredged Material Overflow From Mechanically Filled Hopper Barges in Mobile Bay, Alabama

1990English

Amanote Research

Note-taking for researchers

Follow Amanote


© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy