Ecological Evaluation of Proposed Discharge of Dredged Material From Oakland Harbor Into Ocean Waters (Phase 3 B of -42-Foot Project)
doi 10.2172/7236553
Full Text
Open PDFAbstract
Available in full text
Date
June 1, 1992
Authors
Publisher
Office of Scientific and Technical Information (OSTI)