Amanote Research
Register
Sign In
Multicast Scheduling in Feedback-Based Two-Stage Switch
doi 10.1109/hpsr.2009.5307438
Full Text
Open PDF
Abstract
Available in
full text
Date
June 1, 2009
Authors
Bing Hu
Kwan L. Yeung
Publisher
IEEE
Related search
Two-Stage Job Scheduling Model Based on Revenues and Resources
Lecture Notes in Computer Science
Computer Science
Theoretical Computer Science
A Novel Multicast Scheme for Feedback-Based Multicast Services Over Wireless Networks
Eurasip Journal on Wireless Communications and Networking
Computer Networks
Computer Science Applications
Signal Processing
Communications
Size-Based Flow Scheduling in a CICQ Switch
Two-Stage Flowshop Scheduling With Outsourcing Allowed
International Journal of u- and e- Service, Science and Technology
Computer Networks
Software
Communications
Multicast Multigroup Precoding and User Scheduling for Frame-Based Satellite Communications
IEEE Transactions on Wireless Communications
Electronic Engineering
Applied Mathematics
Computer Science Applications
Electrical
Compaction of Schedules and a Two-Stage Approach for Duplication-Based DAG Scheduling
IEEE Transactions on Parallel and Distributed Systems
Hardware
Computational Theory
Signal Processing
Architecture
Mathematics
A Multicast FCFS Output Queued Switch Without Speedup
Lecture Notes in Computer Science
Computer Science
Theoretical Computer Science
Extremum Feedback for Very Large Multicast Groups
Lecture Notes in Computer Science
Computer Science
Theoretical Computer Science
Leaky-Wave Exploration of Two-Stage Switch-On in a Nematic Pi-Cell
Applied Physics Letters
Astronomy
Physics